Introduction to Well Connected Alliance April 2014 Timelapse

Let's dive into the details surrounding Well Connected Alliance April 2014 Timelapse. April

Well Connected Alliance April 2014 Timelapse Comprehensive Overview

See inside tunnel one (southbound) as the See how our spoil from Alice Tunnel Boring Machine (TBM) work underground is transferred from conveyor to our spoil handling ... Watch a close-up view of how Dennis the giant yellow gantry moves to place beams on ramps at the Great North Road ...

Video of work activity at various locations around the Waterview

Summary & Highlights for Well Connected Alliance April 2014 Timelapse

  • Watch the assembly of the Culvert Gantry at the Southern Approach Trench. The first culvert is forklifted into the tunnel, tunnel ...
  • Watch Alice Tunnel Boring Machine (TBM) move through the first tunnel (southbound), the culvert gantry place concrete culverts ...
  • Follow the preparation work for Alice TBM's relaunch in the second (northbound) tunnel.
  • Video includes installation of culverts into the second (northbound) tunnel, construction of the temporary bridges at the Northern ...
  • Follow Alice TBM's big turnaround using NZ sheep grease in the Northern Approach Trench in this month's

That wraps up our extensive overview of Well Connected Alliance April 2014 Timelapse.

Well Connected Alliance April 2014 Timelapse.pdf

Size: 15.89 MB · Format: PDF · Secure Download

Download PDF Read Online

Related Documents